That's a wrap....except for like a zillion other things
I almost can't believe I am saying this, but the cabin is pretty much done you guys. After just shy of three years and a whole lotta blood, sweat, and money we are done with all of our renovations. Don't get me wrong, there is still plenty to do, but the list we set out to accomplish is all checked off. What we've done: Repaired the rotten rim joists in the foundation Repaired and re-painted the exterior Repainted the interior Mold mitigation (the only project that i hated; well demo of the floors was bad too) New Floors throughout (except the bathroom) Replaced the tile behind the wood stove New Kitchen Updated the bathroom Shed facelift Build a friggen 700 Sq Foot deck! What we hired out: The septic system, obviously The French drain and block foundation repair Radon thingy (some tube on the side of the house that allegedly prevents cancer) Natural gas installation and new furnace (coming soon!) What's left: Some decor; it's like 80% there, but still needs a few...